Waterwatch Data Portal
GB_WHI019 Whiteheads Creek at High Street, Seymour
10 March 2010
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Whiteheads Creek at High Street, Seymour GB_WHI019 |
Date and Time | Wednesday 10th March 2010 10:40am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | Rain mm | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 570 | 6.4 | 16.3 | 0.36 | 138 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Kirsten Hogan actually sampled 60mm rain on 7-3-10 and creek has been a banker with lots of debris 2 metres or so up the bank. Lots of debris in middle of creek upstream and under bridge Still flowing quite well, all the way down through Seymour past Emily St to the Goulburn river
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au