Site visit details

Overview

Catchment Goulburn River
Site Creightons Creek at Bartons Lane GB_CRE011
Date and Time Sunday 18th April 2010 12:00pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units Rain mm Water ° C P mg/L Turb NTU
Sample 200 14.5 7
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Rainfall ~60mm end of March, and ~20mm early April EC upper creek is same as March, lower part of creek has lower EC than March Turbidity much the same as March

Creatures Waterwatch method

Image Species Score Quantity
Total bug score
Total abundance 0 - 35 35+
0 - 200 Poor Good
200+ Fair Very good
Total abundance: 0 Total score: 0 Overall rating: Poor

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au