Waterwatch Data Portal
GB_CRE012 Creightons Creek at Fay's
16 May 2010
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Creightons Creek at Fay's GB_CRE012 |
Date and Time | Sunday 16th May 2010 12:00pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|
Sample | 190 | 7.6 | 10 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall ~60mm to 24th April, and ~24mm end April early May EC very similar to April Turbidity mostly lower than April pH for CRE002 - 7.0, CRE012 - 7.6 and CRE015- 7.3 inconsistent - meter??????? Note from KJH, John's technique and meter were checked at QAQC on 24th of June and found to be Okay. Hodgy explained this variation is normal
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au