Waterwatch Data Portal
GB_CRE002 Creightons Creek u/s of Threlful Creek
18 July 2010
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Creightons Creek u/s of Threlful Creek GB_CRE002 |
Date and Time | Sunday 18th July 2010 12:00pm |
Approved | Approved |
Physical Chemical Tests
E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 110 | 7 | 8.5 | 21 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall ~60mm end of June, ~same 1st two weeks July. EC diluting affect of high creek flows reduced EC at all sites except CRE015, possibly due to discharge area. BAR010, CRE008 and CRE015 relatively high turbidity, possibly local disturbance. pH meter has been verified, site variations not due to meter but local change in ion balance.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au