Waterwatch Data Portal
GB_CRE002 Creightons Creek u/s of Threlful Creek
19 December 2010
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Creightons Creek u/s of Threlful Creek GB_CRE002 |
Date and Time | Sunday 19th December 2010 12:00pm |
Approved | Approved |
Physical Chemical Tests
E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 110 | 14 | 21 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall 200 mm plus between 25-11-10 and 18-12-10 EC upper creek similar to November. CRE011 to 014 lower than November Turbidity - RAM and CRE007 and 008 significantly higher, but not BAR010, so RAM probably the source
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au