Waterwatch Data Portal
CO_PAK001 Wetland at end of Pakington st, Newtown
6 May 2009
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Wetland at end of Pakington st, Newtown CO_PAK001 |
Date and Time | Wednesday 6th May 2009 10:50am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 230 | 7 | 0.14 | 16 | 11.5 | 38.5 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Weather conditions were overcast Had 26ml of rain more than a week ago Estimate of flow was not flowing and temporary water appearance was clear with some leaf litter No water flowing from drain Litter pollutants where plastic and woody debris pH strip 7.0
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au