Waterwatch Data Portal
CO_PAK001 Wetland at end of Pakington st, Newtown
25 September 2009
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Wetland at end of Pakington st, Newtown CO_PAK001 |
Date and Time | Friday 25th September 2009 11:30am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 65 | 6.4 | 100 | 7 | 0.14 | 13 | 14 | 28 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Sampled with Michael Darcy Overcast, raining, windy, rained 30mm more than a week ago, rained during last 24 hours, not flowing, clear but muddy appearance, 0-50cm deep, no water flowing from drain,
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au