Waterwatch Data Portal
NE_CLE020 Clear Creek, Site 1- Upper Tributory Site
31 March 2005
Site visit details
Overview
Catchment | Ovens River |
---|---|
Site | Clear Creek, Site 1- Upper Tributory Site NE_CLE020 |
Date and Time | Thursday 31st March 2005 10:00am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 77 | 7 | 150 | 6 | 0 | 18.4 | 0 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
It surprised me that the creek was still running this far up. Its very narrow as it flows over the rocks but definitely flowing. - Need on-site help to identify all of the macros. Please arrange a suitable time to meet.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au