Waterwatch Data Portal
NE_KIT070 Kinchington Creek (Osbornes Flat PS)
15 June 2006
Site visit details
Overview
Catchment | Kiewa River |
---|---|
Site | Kinchington Creek (Osbornes Flat PS) NE_KIT070 |
Date and Time | Thursday 15th June 2006 14:00pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 70 | 6.5 | 0.03 | 6 | 10 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Staff: carolyn Humby Testing was conducted at the site and was done with Vic Citroen (teacher). The studetns are not able to attend this site as they do not have access to a vehicle
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au