Waterwatch Data Portal
WG_TOM200 Thomson River - George Robinson Pk u/s Swing Br.
27 November 1997
Site visit details
Overview
Catchment | Thomson River |
---|---|
Site | Thomson River - George Robinson Pk u/s Swing Br. WG_TOM200 |
Date and Time | Thursday 27th November 1997 12:00pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | EC µS/cm | GB Height m | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 900 | 7.35 | 0 | 20.4 | 0.08 | 21 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
EC repeated and replicated. Flow of the river very low at around this point. Shutting the weir at Maffra, with high salt levels encroaching from the lake?
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au