Site visit details

Overview

Catchment Kiewa River
Site Commissioners Creek, Yackandandah NE_COM050
Date and Time Thursday 17th June 1999 00:00am
Approved Approved

Notes

Physical Chemical Tests

Habitat

There is a large concrete pipe running from the road directly into the creek (see photo). At the time of the assessment there was no water at the site! Also three separate drains located at the site and running through under the bridge. Site appears to have a excellent cover of riffles, pools and bends.
Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
Fair 3 Fair 6 Poor 4 VeryPoor 1 Fair 6 Fair 20

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au