Waterwatch Data Portal
Site visit details
Overview
Catchment | Kiewa River |
---|---|
Site | House Creek - Brockley St bridge, NE_HOU050_RD |
Date and Time | Wednesday 5th July 2006 00:00am |
Approved | Approved |
Habitat
habitat conducted at bridge where concrete bridge pylons and concrete through-fare make up part of the banks with rock armouring. Bridge shading areas. Plenty of rubbish from stormwater drains.
Bank Erosion Stability | Bank Vegetation | In Stream Cover | Riffles Pools Bends | Verge Vegetation | Overall |
---|---|---|---|---|---|
Fair 3 | Good 8 | Poor 4 | Fair 3 | Good 8 | Fair 26 |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au