Waterwatch Data Portal
NE_SLC045 Slaughteryard Creek, Merriang South
16 February 2007
Site visit details
Overview
Catchment | Ovens River |
---|---|
Site | Slaughteryard Creek, Merriang South NE_SLC045 |
Date and Time | Friday 16th February 2007 00:00am |
Approved | Approved |
Habitat
Site is stagnant at the moment due to the dry conditions. There is a pipe under the road that runs directly into the creek. Further upstream there is also a small dam that feeds into the creek. A lot of the surrounding land is for grazing only, previous dairy farm. The landowners of the surrounding area tell me that no chemicals are used no the properties.
Bank Erosion Stability | Bank Vegetation | In Stream Cover | Riffles Pools Bends | Verge Vegetation | Overall |
---|---|---|---|---|---|
Poor 2 | Good 8 | Fair 6 | Poor 2 | Fair 6 | Fair 24 |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au