Site visit details

Overview

Catchment Loddon River
Site Loddon River @ Bridgewater bridge NC_LOD500_RD
Date and Time Thursday 6th August 1998 12:00pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C P mg/L Turb NTU
Sample 2400 0.015 15
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Fast flow, high level, pale yellow colour. Heavy local rain over previous week. More salt possibly because of rainfall and rising groundwater.

Creatures Waterwatch method

Image Species Score Quantity
Total bug score
Total abundance 0 - 35 35+
0 - 200 Poor Good
200+ Fair Very good
Total abundance: 0 Total score: 0 Overall rating: Poor

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au