Waterwatch Data Portal
ME_YSC099 Mt Waverley Wetlands at the rocky embankment at the most westerly end, nearest Blackburn Rd
26 July 2009
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Mt Waverley Wetlands at the rocky embankment at the most westerly end, nearest Blackburn Rd ME_YSC099 |
Date and Time | Sunday 26th July 2009 14:00pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 240 | 6.9 | 11.5 | 10 |
Weather | n/s |
---|---|
Last rainfall | More than a week ago |
Flow estimate | n/s |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Last rainfall not specified. There appeared to be very little flow through the tunnel beneath the dam at the foot of the wetlands ? may be due to a blockage? In any event, site 2 flow was unexpectedly low. The water flow through the wetlands is still erratic and unpredictable ? Melbourne Water are undertaking remedial work at present, aimed at making the wetlands perform as designed. The flow of oil down the Glen Waverley drain continues to be of concern. The oily slick is very visible at the point where the two arms of the creek meet. Melbourne Water has been advised of this issue, and have promised to investigate.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au