Waterwatch Data Portal
ME_YDI800 Diamond Creek @ Edendale Environment Centre footbridge
1 January 2010
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek @ Edendale Environment Centre footbridge ME_YDI800 |
Date and Time | Friday 1st January 2010 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 22.1 | 22.9 | 200 |
Weather | Overcast, Humid |
---|---|
Last rainfall | Last 24 hrs |
Flow estimate | Fast |
Water Appearance | |
Stream depth | |
Stream width | 6.70 |
Hazards | |
Litter/Pollutants |
Rate of flow much faster at 10:15am Waterway width had increased to 10.6 by 10:15am Turbidity measured at 10:15am: sample was diluted 1:1 it then measured 300 and was multiplied by 2 to estimate actual turbidity as 600. Increase in stream width and depth since last monitoring What stands out about the site today? Sudden increase in flow. Branches were blocking flow at first, then many broke away and were carried downstream with previously trapped rubbish. Water carrying lots of plant debris, then medium sized branches as flow increased. Black duck and 2 young struggling against the flow. Calystegia in flower along banks. Checked Yarra/Diamond Creek confluence 2-1-2010. Lots of dark silt debris and rubbish entering Yarra.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au