Waterwatch Data Portal
ME_EBA240 Balcome Creek at Two Bays Road (site 2), Mt Eliza
31 August 2008
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Balcome Creek at Two Bays Road (site 2), Mt Eliza ME_EBA240 |
Date and Time | Sunday 31st August 2008 00:30am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 15 |
Weather | sunny periods with showers |
---|---|
Last rainfall | Last 24 hrs |
Flow estimate | Normal base flow |
Water Appearance | |
Stream depth | 60.00 |
Stream width | |
Hazards | |
Litter/Pollutants |
Downstream water level is 70cm. Water has resided slightly since last week. While there has been recent rain, water levels have slightly dropped, still clearly flowing. Some weed control has been carried out behind Site 2 upstream mostly focussing on Gorse and Sallow Wattle, spanish heath remains. Stormwater pipe which comes out of site 2 downstream is flowing into site 2.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au