Site visit details

Overview

Catchment Bunyip River
Site Balcome Creek at Two Bays Road (site 2), Mt Eliza ME_EBA240
Date and Time Sunday 31st August 2008 00:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units Air ° C Water ° C Turb NTU
Sample 15
Weather sunny periods with showers
Last rainfall Last 24 hrs
Flow estimate Normal base flow
Water Appearance
Stream depth 60.00
Stream width
Hazards
Litter/Pollutants
Downstream water level is 70cm. Water has resided slightly since last week. While there has been recent rain, water levels have slightly dropped, still clearly flowing. Some weed control has been carried out behind Site 2 upstream mostly focussing on Gorse and Sallow Wattle, spanish heath remains. Stormwater pipe which comes out of site 2 downstream is flowing into site 2.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au