Waterwatch Data Portal
ME_YYD807 Boulevard Drain Siltation Pond (since 19/03/2006)
16 July 2007
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Boulevard Drain Siltation Pond (since 19/03/2006) ME_YYD807 |
Date and Time | Monday 16th July 2007 09:15am |
Approved | Approved |
Physical Chemical Tests
No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample |
Weather | Not Recorded |
---|---|
Last rainfall | Last 24 hrs |
Flow estimate | Slow |
Water Appearance | |
Stream depth | 50.00 |
Stream width | |
Hazards | |
Litter/Pollutants |
20mm rain.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au