Waterwatch Data Portal
ME_YDI800 Diamond Creek @ Edendale Environment Centre footbridge
23 March 2010
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek @ Edendale Environment Centre footbridge ME_YDI800 |
Date and Time | Tuesday 23rd March 2010 11:30am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.02 | 370 | 0.1 | 7.2 | 22 | 18.6 | 100 |
Weather | Cloudy |
---|---|
Last rainfall | Last 3 days |
Flow estimate | Normal base flow |
Water Appearance | |
Stream depth | 100.00 |
Stream width | 5.00 |
Hazards | |
Litter/Pollutants |
2 mm minimum 3 days ago What has changed since last time you monitored? Lower flow after floods creek before What stands out about the site today? Lots of litter in branches
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au