Site visit details

Overview

Catchment Yarra River
Site Diamond Creek @ Edendale Environment Centre footbridge ME_YDI800
Date and Time Tuesday 23rd March 2010 11:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.02 370 0.1 7.2 22 18.6 100
Weather Cloudy
Last rainfall Last 3 days
Flow estimate Normal base flow
Water Appearance
Stream depth 100.00
Stream width 5.00
Hazards
Litter/Pollutants
2 mm minimum 3 days ago What has changed since last time you monitored? Lower flow after floods creek before What stands out about the site today? Lots of litter in branches

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au