Waterwatch Data Portal
ME_DWA100 Wadsley Drain Frankston Fwy South of pump
13 January 2010
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Wadsley Drain Frankston Fwy South of pump ME_DWA100 |
Date and Time | Wednesday 13th January 2010 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 6 | 3800 | 1 | 7.6 | 22 | 19.4 | 20 |
Weather | Overcast |
---|---|
Last rainfall | Last 24 hrs |
Flow estimate | None |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Very little rainfall in the past 24hours temperature has been very hot in the past week. 30-40 C Calibration 4.0 7.1 10.0 water level was low phosphate was greater than high range 1.0
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au