Site visit details

Overview

Catchment Bunyip River
Site Wadsley Drain Frankston Fwy north of pump ME_DWA200
Date and Time Saturday 4th November 2006 00:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units Air ° C Water ° C Turb NTU
Sample 6 3900 8.5 18.5 5
Weather Cloudy
Last rainfall Last 3 days
Flow estimate Permanent
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
12.6mm rain. Compared with past visits, lots of bird life including <8 ducks, very small bird and a seagull.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au