Waterwatch Data Portal
ME_EME993 Merricks Beach Drainage: Foam St drain as it exits pip under Surf St into foreshore
23 February 2006
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Merricks Beach Drainage: Foam St drain as it exits pip under Surf St into foreshore ME_EME993 |
Date and Time | Thursday 23rd February 2006 09:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.04 | 0.02 | 10 | 6.3 | 20 |
Weather | Rain |
---|---|
Last rainfall | More than a week ago |
Flow estimate | Very fast |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
20mm rain.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au