Waterwatch Data Portal
ME_YBA005 Banyule Creek headwaters@ Simpson barracks, Watsonia
21 April 2007
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Banyule Creek headwaters@ Simpson barracks, Watsonia ME_YBA005 |
Date and Time | Saturday 21st April 2007 08:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 3.8 | 440 | 0.2 | 7.1 | 12.5 | 9.5 | 10 |
Weather | Overcast |
---|---|
Last rainfall | More than a week ago |
Flow estimate | Flowing |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Last rainfall not specified. After the initial testing of Banyule Creek in the morning, it was decided to retest in the afternoon during actual rainfall conditions. As seen in the final results there was significant changes in phosphate levels and dissolved oxygen. Max had installed a stormwater crossover within the grounds which has made a considerable change in to the flow of runoff towards the bottom wetland and Banyule Creek. This I see will most likely produce cleaner water conditions at Banyule Creek due to less travelling time of the water runoff into the creek. A major improvement for future readings and bug diversity.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au