Site visit details

Overview

Catchment Yarra River
Site Banyule Creek headwaters@ Simpson barracks, Watsonia ME_YBA005
Date and Time Saturday 21st April 2007 08:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units Air ° C Water ° C Turb NTU
Sample 0 3.8 440 0.2 7.1 12.5 9.5 10
Weather Overcast
Last rainfall More than a week ago
Flow estimate Flowing
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Last rainfall not specified. After the initial testing of Banyule Creek in the morning, it was decided to retest in the afternoon during actual rainfall conditions. As seen in the final results there was significant changes in phosphate levels and dissolved oxygen. Max had installed a stormwater crossover within the grounds which has made a considerable change in to the flow of runoff towards the bottom wetland and Banyule Creek. This I see will most likely produce cleaner water conditions at Banyule Creek due to less travelling time of the water runoff into the creek. A major improvement for future readings and bug diversity.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au