Waterwatch Data Portal
ME_YBA006 Wetland 1@ Banyule Creek headwaters, Simpson Barracks Watsonia
23 February 2008
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Wetland 1@ Banyule Creek headwaters, Simpson Barracks Watsonia ME_YBA006 |
Date and Time | Saturday 23rd February 2008 09:15am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 7.2 | 110 | 0.02 | 7.8 | 13 | 14 | 30 |
Weather | Overcast |
---|---|
Last rainfall | Last 24 hrs |
Flow estimate | Still |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Water level at wetland has dropped quite a lot since january. This however had no effect of the condition of the water apart from turbidity. Should there be no rainfall to top it up during march I can only assume the clarity will become worse towards the centre of the pond. Bug life minimal with only backswimmers, seed shrimp and diving beetles noticed.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au