Site visit details

Overview

Catchment Yarra River
Site Banyule Swamp@ Banyule flats, Somerset St end near seat ME_YBN900
Date and Time Sunday 30th March 2008 09:15am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 6.4 190 0.03 7.8 15 14.5 20
Weather Overcast
Last rainfall Last 3 days
Flow estimate Still
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Rained in past 48hrs. I didn't know what to expect from teh testing as the swamp was very low to almost drying up again. The past rains had actually transformed the whole outlook of the swamp to a positive. My sample had to be taken around 20mtrs. in from the edge to get a good sample. Although the nitrate level was still on the high side, it was a dramatic drop from the previous test. We are expecting further rainfalls at the start of April which should top up the swamp to almost full capacity again. Great news for the fauna and bugs concerned. No further visuals on the unknown frog as water level is past the bush.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au