Site visit details

Overview

Catchment Yarra River
Site Treatment Pond next to the Darebin Creek and CSR Ready mix Preston Plant, Thornbury. ME_YDW002
Date and Time Saturday 22nd November 2008 10:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units Air ° C Water ° C Turb NTU
Sample 0 4.2 230 0.05 7 11 12 15
Weather Rain
Last rainfall Raining now
Flow estimate None
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Rainfall event monitoring. Pond 90% full at time of sampling. (due to rainfall) Ammonium result was 0 for visocolor, 0.74 with Smart 2. Samples not filtered. Do sampled with Smart 2, not visocolor. Phosphate sampled with Smart2.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au