Waterwatch Data Portal
ME_YBA500 Banyule Creek @ footbridge Banyule Flats Reserve
29 November 2008
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Banyule Creek @ footbridge Banyule Flats Reserve ME_YBA500 |
Date and Time | Saturday 29th November 2008 07:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.02 | 7.5 | 610 | 0.06 | 7.8 | 14.5 | 13.6 | 10 |
Weather | Overcast |
---|---|
Last rainfall | Last 24 hrs |
Flow estimate | Normal base flow |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Good flows at test site this month have managed to reduce the high levels of Phosphate and Ammonium deposits that were recorded in October. Although far from clean, the creek is showing signs of improvement in bug activity. Limited to mainly backswimmers, there were planty of tadpoles along its length. Exotic plants and weeds are a real concern which are choking the native species and the creek itself.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au