Waterwatch Data Portal
ME_EBA230 Balcombe Creek at Two Bays Road (site 1), Mt Eliza
22 June 2008
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Balcombe Creek at Two Bays Road (site 1), Mt Eliza ME_EBA230 |
Date and Time | Sunday 22nd June 2008 00:00am |
Approved | Approved |
Physical Chemical Tests
No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample |
Weather | gusty winds and rainy, 12 degrees air temp |
---|---|
Last rainfall | Raining now |
Flow estimate | Normal base flow |
Water Appearance | |
Stream depth | 83.00 |
Stream width | |
Hazards | |
Litter/Pollutants |
all sites with water and gradual flow, quite a bit of shower activity in the past 3 days. Sites looking really good this week, all points of the creek were flowing well with additonal rainf alling at the time of inspection.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au