Waterwatch Data Portal
ME_EBA240 Balcome Creek at Two Bays Road (site 2), Mt Eliza
14 June 2009
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Balcome Creek at Two Bays Road (site 2), Mt Eliza ME_EBA240 |
Date and Time | Sunday 14th June 2009 11:00am |
Approved | Approved |
Physical Chemical Tests
No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample |
Weather | sunny periods with cloudy patches- approx 12 degrees air temp |
---|---|
Last rainfall | Last 7 days |
Flow estimate | not specified |
Water Appearance | |
Stream depth | 65.00 |
Stream width | |
Hazards | |
Litter/Pollutants |
depths upstream 60cm, downstream 70cm., water skimming over the top of the sandbags, water levels don't appear to be dropping or rising. Significant rains have put some water into the pond around the creek. got a bit of rain during the week, not sure how much but it has made a difference with the amount of water in the ponds near the creek and the creek itself has more water in it.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au