Waterwatch Data Portal
ME_EBA260 Balcombe Creek at Two Bays Road (Site 3), Mt Eliza
14 June 2008
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Balcombe Creek at Two Bays Road (Site 3), Mt Eliza ME_EBA260 |
Date and Time | Saturday 14th June 2008 11:00am |
Approved | Approved |
Physical Chemical Tests
No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample |
Weather | Overcast |
---|---|
Last rainfall | Last 3 days |
Flow estimate | Normal base flow |
Water Appearance | |
Stream depth | 20.00 |
Stream width | |
Hazards | |
Litter/Pollutants |
heavy rains in past 3 days. Lots of green and water flowing smoothly. Low light, cold 10 degrees air temp.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au