Waterwatch Data Portal
ME_EBU050 Bunyip River just downstream of Back Creek confuence, opposite Back Creek syphon
12 October 2009
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Bunyip River just downstream of Back Creek confuence, opposite Back Creek syphon ME_EBU050 |
Date and Time | Monday 12th October 2009 14:30pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 6.6 | 60 | 23 | 14.5 | 10 |
Weather | Sunny |
---|---|
Last rainfall | Last 3 days |
Flow estimate | Fast |
Water Appearance | |
Stream depth | 50.00 |
Stream width | 5.00 |
Hazards | |
Litter/Pollutants |
lots or revegetation present. large number of water plants present in low lying areas. Lots of dumped industrial rubbish. timber, concrete rusty pipes. lots of epicormic regrowth. Dodgey phos result of 0.11ppm. Possibly tricky equipment.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au