Waterwatch Data Portal
ME_EME991 Merricks Beach Drainage: Point where all combined flows actually flow into Western Port Bay
11 August 2008
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Merricks Beach Drainage: Point where all combined flows actually flow into Western Port Bay ME_EME991 |
Date and Time | Monday 11th August 2008 09:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.1 | 200 | 0.3 | 10 | 7.1 | 16 | 160 |
Weather | Rain |
---|---|
Last rainfall | Raining now |
Flow estimate | Fast |
Water Appearance | |
Stream depth | 5.00 |
Stream width | 5.00 |
Hazards | |
Litter/Pollutants |
Creek which had been flowing into the bay every day since 11th August 2008 (10 days), stopped flowing. Rain every day.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au