Site visit details

Overview

Catchment Yarra River
Site Darebin Creek, upstream Murray Road/Southern Road bridge, Preston/Heidelberg Heights. ME_YDA435
Date and Time Saturday 16th May 2009 10:15am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.36 2.6 1090 0.11 7.7 11 14 10
Weather Overcast
Last rainfall Last 24 hrs
Flow estimate Normal base flow
Water Appearance
Stream depth 30.00
Stream width 0.20
Hazards
Litter/Pollutants
2 tests done for DO, Smart 2 got 2.5mg/L, visocolor got 8 mg/l, this is being investigated. Smart 2 used for phsophate, not sure which instrument used to test ammonium

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au