Waterwatch Data Portal
ME_EBA230 Balcombe Creek at Two Bays Road (site 1), Mt Eliza
23 March 2008
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Balcombe Creek at Two Bays Road (site 1), Mt Eliza ME_EBA230 |
Date and Time | Sunday 23rd March 2008 17:00pm |
Approved | Approved |
Physical Chemical Tests
No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample |
Weather | overcast, cloudy and humid |
---|---|
Last rainfall | Last 24 hrs |
Flow estimate | not specified |
Water Appearance | |
Stream depth | 16.00 |
Stream width | |
Hazards | |
Litter/Pollutants |
light showers, 17 degrees air temp. Signs of receeding water, duckweed "beached" up the edges. Fox scats
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au