Waterwatch Data Portal
ME_EBA230 Balcombe Creek at Two Bays Road (site 1), Mt Eliza
6 April 2008
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Balcombe Creek at Two Bays Road (site 1), Mt Eliza ME_EBA230 |
Date and Time | Sunday 6th April 2008 14:40pm |
Approved | Approved |
Physical Chemical Tests
No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample |
Weather | Sunny |
---|---|
Last rainfall | Last 3 days |
Flow estimate | Trickle |
Water Appearance | |
Stream depth | 26.00 |
Stream width | |
Hazards | |
Litter/Pollutants |
last 2 days heavy rain and wind, a lot of debris around, 18 degrees air temp. Lots of life seen and heard today mainly birds and skinks.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au