Waterwatch Data Portal
ME_EBA240 Balcome Creek at Two Bays Road (site 2), Mt Eliza
13 April 2008
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Balcome Creek at Two Bays Road (site 2), Mt Eliza ME_EBA240 |
Date and Time | Sunday 13th April 2008 00:10am |
Approved | Approved |
Physical Chemical Tests
No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample |
Weather | cloudy, recent rain & windy, 15 degrees air temp |
---|---|
Last rainfall | Last 3 days |
Flow estimate | Trickle |
Water Appearance | |
Stream depth | 32.00 |
Stream width | |
Hazards | |
Litter/Pollutants |
Heavy rain a couple of days ago. Puddle between 25-40cm upstream. water level downstream between 30&35cm. Site 2 has water where we normally access the creek and in the underground tunnels. Small amount of water in site 2 upstream though the next body of water looks confined to a puddle.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au