Site visit details

Overview

Catchment Bunyip River
Site Balcome Creek at Two Bays Road (site 2), Mt Eliza ME_EBA240
Date and Time Sunday 25th May 2008 13:30pm
Approved Approved

Notes

Physical Chemical Tests

No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units Air ° C Water ° C Turb NTU
Sample
Weather Sunny
Last rainfall More than a week ago
Flow estimate Slow
Water Appearance
Stream depth 45.00
Stream width
Hazards
Litter/Pollutants
last rainfall not specified. All sites held water. 15 degrees air temp. Site 2 upstream (level- 10-30cm) appears to be quite variable and found it difficult to access to determine water depth. Downstream appears to be quite good- level 60cm.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au