Waterwatch Data Portal
ME_EBA240 Balcome Creek at Two Bays Road (site 2), Mt Eliza
9 June 2009
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Balcome Creek at Two Bays Road (site 2), Mt Eliza ME_EBA240 |
Date and Time | Tuesday 9th June 2009 10:30am |
Approved | Approved |
Physical Chemical Tests
No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample |
Weather | Overcast |
---|---|
Last rainfall | Last 24 hrs |
Flow estimate | Slow |
Water Appearance | |
Stream depth | 50.00 |
Stream width | |
Hazards | |
Litter/Pollutants |
some showers during the day, coolish morning 12 degrees air temp. Site has improved from previous water elevels since 25/05/2008. Levels: upstream- variable between 40cm at Two Bays Road Bridge. Downstream: 50-62 at Two Bays Road Bridge.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au