Site visit details

Overview

Catchment Dandenong
Site Old Joes Creek - 10 metres before it joins Dandenong Creek (suburb?) ME_DOJ090
Date and Time Sunday 17th August 2008 00:15am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 8.3 514 0.14 2.39 7.5 10.5 29
Weather No Recorded
Last rainfall Last 7 days
Flow estimate No Recorded
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Melb Water has removed the soil and vegetation from the creeks at Bayswater Park. They are now just concrete channels with a small section with gravel.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au