Waterwatch Data Portal
ME_YDI810 Diamond Creek, Railway Pde, Eltham
27 June 2009
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek, Railway Pde, Eltham ME_YDI810 |
Date and Time | Saturday 27th June 2009 10:30am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.02 | 9 | 330 | 0.05 | 6.6 | 9.6 | 8.4 | 50 |
Weather | Cloudy |
---|---|
Last rainfall | Last 7 days |
Flow estimate | Normal base flow |
Water Appearance | |
Stream depth | 600.00 |
Stream width | 10.00 |
Hazards | |
Litter/Pollutants |
About 3 mm of rain has fallen during the past 4 or 5 days, but not in the last 2 days. There is a lot of suspended soil in the water (typical).
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au