Site visit details

Overview

Catchment Yarra River
Site Darebin Creek, Dundas Street Drain or Cave Clan Drain (upstream footbridge and Dundas St wetland) Thornbury/Ivanhoe ME_YDA534
Date and Time Saturday 22nd November 2008 10:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.84 120 0.09 8.5 11 9.5 60
Weather Rain
Last rainfall Raining now
Flow estimate not specified
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Ammonium - Filtered (Visocolor 0.04 darker shade of ywllow, but not 10 green dit. Phosphate - Filtered Smart 2 - multiply by 0.326 = 0.0945. D.O - not measured.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au