Site visit details

Overview

Catchment Yarra River
Site Arthurs Creek at Chapel Lane, single land bridge, Nutfield/Doreen ME_YAR780
Date and Time Monday 12th October 2009 13:35pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units Air ° C Water ° C Turb NTU
Sample 260 7.2 23 14
Weather Sunny
Last rainfall Last 7 days
Flow estimate Fast
Water Appearance
Stream depth 60.00
Stream width 3.00
Hazards
Litter/Pollutants
Gauge level today was 0.49m, which is 19cm higher than when last measured. Fresh silt deposits suggested that the water level in the last week or so got to about 2m. At Mill Park the last rainfall I recorded was about 2mm just on a week ago.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au