Waterwatch Data Portal
ME_ESW100 Sweetwater Creek, End of Fenton Street (bridge over creek)
27 December 2009
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Sweetwater Creek, End of Fenton Street (bridge over creek) ME_ESW100 |
Date and Time | Sunday 27th December 2009 10:15am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 8 | 1600 | 0.07 | 6.5 | 22 | 17.3 | 10 |
Weather | Overcast |
---|---|
Last rainfall | Last 3 days |
Flow estimate | Slow |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
reports from residents that there had been a heavy yellow contamination some weeks ago.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au