Site visit details

Overview

Catchment Yarra River
Site Plenty River under Main Road (Circuit St) Bridge, Greensborough ME_YPL693
Date and Time Tuesday 13th April 2010 11:35am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.07 8 380 0.05 7.3 20.3 15.7 40
Weather Cloudy
Last rainfall Last 3 days
Flow estimate Normal base flow
Water Appearance
Stream depth 55.00
Stream width 7.00
Hazards
Litter/Pollutants
Lots of debris from floods Depth is 10-100cm Phosphate and Ammonium tests filtered Phosphate and ammonium tests conducted at 16.8 degrees C (little cold) What has changed since last time you monitored? looks muddier Other observations? Debris has been rmoved from footbridge

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au