Waterwatch Data Portal
ME_EME130 Merricks Creek at refuge pool near Bridge St
6 March 2010
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Merricks Creek at refuge pool near Bridge St ME_EME130 |
Date and Time | Saturday 6th March 2010 11:20am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 3 | 2900 | 0.07 | 7.3 | 21.6 | 20 | 30 |
Weather | not specified |
---|---|
Last rainfall | Last 24 hrs |
Flow estimate | not specified |
Water Appearance | |
Stream depth | 0.00 |
Stream width | 0.00 |
Hazards | |
Litter/Pollutants |
"It rained yesterday. The first time for a long time. Very little rain in February and January. The refuge pool is low in oxygen, low in salinity and low in phosphate. Dirt washed in from the rain making it a bit turbid." Karri Giles.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au