Site visit details

Overview

Catchment Yarra River
Site small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough ME_YPL698
Date and Time Tuesday 13th April 2010 10:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 16.5
Weather Cloudy
Last rainfall Last 3 days
Flow estimate None
Water Appearance
Stream depth 0.00
Stream width 0.00
Hazards
Litter/Pollutants
18.4 mm rain in last week. No flow, but damp concrete pad, thus no flow for only a few hours. Good flow on the Plenty River, looks very muddy. Only air temp done, taken on concrete pad. Lots of rubbish, due to recent rainfall.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au