ME_YPL698 small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough
13 April 2010
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough ME_YPL698 |
Date and Time | Tuesday 13th April 2010 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 16.5 |
Weather | Cloudy |
---|---|
Last rainfall | Last 3 days |
Flow estimate | None |
Water Appearance | |
Stream depth | 0.00 |
Stream width | 0.00 |
Hazards | |
Litter/Pollutants |
18.4 mm rain in last week. No flow, but damp concrete pad, thus no flow for only a few hours. Good flow on the Plenty River, looks very muddy. Only air temp done, taken on concrete pad. Lots of rubbish, due to recent rainfall.