Waterwatch Data Portal
ME_EME992 Merricks Beach Drainage: Confluence of all drains in beach foreshore
22 November 2009
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Merricks Beach Drainage: Confluence of all drains in beach foreshore ME_EME992 |
Date and Time | Sunday 22nd November 2009 09:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.03 | 200 | 0.3 | 7.1 | 0 | 15 | 50 |
Weather | not spec |
---|---|
Last rainfall | Last 24 hrs |
Flow estimate | not spec |
Water Appearance | |
Stream depth | 0.00 |
Stream width | 0.00 |
Hazards | |
Litter/Pollutants |
none of this information is specified. Tom does very specific montioring of the water quality in events where the estuary opens. e.coli - 5400
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au