Waterwatch Data Portal
ME_YSA560 Salt Creek, end of Pickwood Crt bridge
22 April 2010
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Salt Creek, end of Pickwood Crt bridge ME_YSA560 |
Date and Time | Thursday 22nd April 2010 14:30pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 10 | 330 | 6.5 | 22.7 | 21.5 | 40 |
Weather | Cloudy |
---|---|
Last rainfall | Last 7 days |
Flow estimate | Normal base flow |
Water Appearance | |
Stream depth | 10.00 |
Stream width | 0.50 |
Hazards | |
Litter/Pollutants |
water quite turbid.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au