Site visit details

Overview

Catchment Bunyip River
Site Sunshine Creek at upper site on left side of split ME_ESU100
Date and Time Monday 7th June 2010 15:10pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 6 510 0.05 11.5 11.3 50
Weather Cloudy
Last rainfall Last 24 hrs
Flow estimate Slow
Water Appearance
Stream depth 30.00
Stream width 80.00
Hazards
Litter/Pollutants
Water flowing over walking track - usually no surface water visible.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au