Waterwatch Data Portal
ME_ESU100 Sunshine Creek at upper site on left side of split
6 September 2010
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Sunshine Creek at upper site on left side of split ME_ESU100 |
Date and Time | Monday 6th September 2010 11:45am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 8 | 520 | 0.05 | 6.6 | 13 | 10.5 | 40 |
Weather | Cloudy |
---|---|
Last rainfall | Last 24 hrs |
Flow estimate | Fast |
Water Appearance | |
Stream depth | 20.00 |
Stream width | 70.00 |
Hazards | |
Litter/Pollutants |
Heavy rain previous three days. Water flowing over walking track. Recent woody weed work in the surrounding bushland (removal of boneseed and thinning sallow wattle). Slight foaming on water surface. Creek running freely. Started photopoint monitoring. Yesterday 10.2mm rain.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au